Post-construction cleaning on the Costa del Sol

Cement residue, paint splashes, plaster dust and the insides of fitted cupboards, cleared from a new build or refurbishment before handover.

The dust that comes back

Plaster dust does not sit still. You clear a room, shut the door, come back an hour later and there is a film on the windowsill again. It gets into the top of the wardrobes, behind the skirting boards, along the top edge of every door, and inside the fitted cupboards that were installed before the last of the sanding was done.

A house can look finished and be full of it. That is the gap this booking fills: the part between the builder putting his tools in the van and a family putting their suitcases down.

Tile adhesive is the hard part

Ask anyone who has finished a build what the worst of it is and they will usually say the adhesive. There are several kinds of glue and grout, they set differently, and they stay stuck to a surface long after the builder has packed up and gone.

Cement residue on tiles and grout sets like stone and takes more than a mop. Paint splashes on glass and frames come off with care rather than force, because the wrong thing takes the frame’s finish with it. Plaster dust has to be lifted rather than pushed around, or you move it from a floor to a wall. Adhesive film on new windows goes brittle in the sun if it is left too long.

Each of those needs a decision about what to use. Getting it wrong costs a surface, which is the sort of mistake that is much more expensive than the clean.

The sun makes it worse here

Two things about this coast change the job. The first is that the sun bakes anything left on glass or metal. A paint splash on a window in July goes hard quickly, and hard is a different problem from tacky.

The second is the water. It is hard, and hard water leaves mineral behind as it dries, so a floor rinsed and left to air can finish with a faint white bloom on it. Drying it rather than leaving it wet is the difference between a floor that looks new and one that looks smeared.

Who this is booked by

Construction companies and developers finishing a project, which here tends to mean a small development of villas or a refurbished apartment block. Homeowners at the end of their own building work, which is the version where the emotional stakes are highest.

And the in-between case: a property that was finished eighteen months ago, has been lived in since, and still has cement dust appearing in the corners of the cupboards every time a door is opened.

The order of work

Top down, and dry before wet. Ceilings, then the tops of cupboards and door frames, then surfaces, then floors. Anything wet done first turns the dust into a paste that then has to be scrubbed off a wall.

Cupboards get emptied of dust rather than wiped at the front. Inside the fitted units is where it hides, and it is the first thing an owner notices when they open a wardrobe in a new house.

Then the glass, last, because everything else puts a film back on it.

Priced by the state of it, not the square metres

A new build with the dust still in the air is a longer job than the same house after a basic clear. The rate is €21 to €26 an hour, plus €25 on a first booking.

The honest version of the quote depends on three answers: how many square metres, whether the work is finished or still in progress around us, and whether the windows still have their protective film on.

If builders are still on site, that is fine and it changes the plan rather than the price. We would rather clean a floor twice than clean it once and hand over a room that is about to be walked through in boots.

Working alongside the trades

We take work from developers who need a handover date met, which means coordinating with whoever is still finishing snagging rather than working around them.

There are long-standing relationships behind that on this coast: plumbers, painters and tilers we have worked with repeatedly and refer on when a job needs a trade rather than a cloth. If your builder has gone quiet and the snagging list is still open, we will tell you who to ring.

Where it runs

Most post-build work comes from Calahonda and Elviria, where the smaller villa developments and the refurbishments are. After that it is the western end, Las Chapas and Artola up through Río Real to Los Monteros, and the villages to the east: Riviera del Sol, Miraflores, Torrenueva, and the houses above them at El Soto and La Mairena.

If the development is larger than one property, say so. Several units can be planned as a sequence, which is a different price from the same number of separate bookings.

Give Pia the address, the square metres and the handover date. If the date is the thing that matters, lead with it. A post-build clean with a deadline is a scheduling problem before it is a cleaning one.

Also worth knowing

Next step

Quote a post-build clean

  • Form or phone, whichever suits
  • Price agreed before anyone travels
  • Run from Calahonda
Form or phone
Speak to us now

Quote a post-build clean